D   a   y       L   o   g
D   a   y       L   o   g
Tuesday 5. júna 2007
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F -2 4.5 6.5 7 6 5.5 0.5
II EX   0.75     ms
IIIa MCh 6.25 6.5 0.25 1.25     1
IIIb MCh PF       4 it. Wght  
II–III M       0.25 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD       0 2.5 4  
IXb FP 52 5.5 11 5.25 -1.25
X FA        
XI F        
XII NCh 2     ms
XIII PrN       0.25     ms
XIV NP 53 12 19 3 0.75     -2.25
XII–XIV N       3 3     NA
XV S2b 21 21.75 0.75 3 2.75 2 -1.25
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2       0.75 4 2.75 2 -1.25
XVI S3           1.5 3  
VII+VIII+XV PS       0.75 8 5.5 4 -3.25
VII+VIII+XV+XVI RS       0.75 8 5.5 4 -3.25
IX–XI FS       5.25 0 2.5 4 -1.25
  S       6 9.5 9.5 9.5 -3.5
XVIIa ECh1 17.5 18 0.5 5 it.    
XVIIb ECh2 19 21 2 5.5     2.75
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       2.5 1.5     -1
XVIIIa EML1 51 4.5 12 2 na    
XVIIIb EML2 14 17.5 3.5 na    
XIX AL 21.75 22 0.25 1.25 2.25 2.75 1
XVIII–XIX Out       5.75 1.25 2.25 2.75 -4.5
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       9.5 7.75 6.75 6.25 -1.75
I SL 22 7 6 5.5
     
WLS in:   out:   in:   out:  
Walks     CleanUps     -1
5.5 11
6.25 6.5
14 18