D   a   y       L   o   g
D   a   y       L   o   g
Friday 29. júna 2007
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -2 7.5 9.5 7 6 5.5 -2.5
II EX sr 7.5 8.25 0.75 0.75     ok
IIIa MCh 8.25 9.5 1.25 1.25     ok
IIIb MCh PF       4 it. Wght  
II–III M       2 2     NA
IV FL 10 10.25 0.25 0.25     ok
V PrM   10.25 10.5 0.25 0.25     ok
VI QU 10.5 11 0.5 0.5     ok
IV–VI US       1 1     ok
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD       0 2.5 4  
IXb FP 51 11 26.5 5.5 -1.5
X FA        
XI F   14.25 17.75 3.5 -3.5
XII NCh 12.25 14.25 2 2     ok
XIII PrN       0.25     ms
XIV NP   0.75     ms
XII–XIV N       2 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       9 0 2.5 4 -5
  S       6.5 9.5 9.5 9.5 -3
XVIIa ECh1 17.75 20 2.25 5 it.    
XVIIb ECh2 26.5 27.5 1 5.5     7.25
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       3.25 1.5     -1.75
XVIIIa EML1 9.5 10 0.5 na    
XVIIIb EML2 20 22.25 2.25 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       2.75 1.25 2.25 2.75 -1.5
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       9.5 7.75 6.75 6.25 -1.75
I SL 27.5 7 6 5.5
     
WLS in:   out:   in:   out:  
Walks     CleanUps     -1
12.25 22.25