D   a   y       L   o   g
D   a   y       L   o   g
Saturday 30. júna 2007
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL 3.5 10.75 7.25 7 6 5.5 -0.25
II EX inc 10.75 11.5 0.75 0.75     ok
IIIa MCh 11.5 12.25 0.75 1.25     0.5
IIIb MCh PF       4 it. Wght  
II–III M       1.5 2     NA
IV FL 12.25 12.5 0.25 0.25     ok
V PrM   12.5 12.75 0.25 0.25     ok
VI QU 12.75 13.5 0.75 0.5     -0.25
IV–VI US       1.25 1     -0.25
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD       0 2.5 4  
IXb FP   13.5 16 2.5  
X FA        
XI F        
XII NCh 16 18 2 2     ok
XIII PrN   18 18.25 0.25 0.25     ok
XIV NP 18.25 19.25 1 0.75     -0.25
XII–XIV N       3.25 3     -0.25
XV S2b 19.25 20.25 1 3 2.75 2 -1.75
XVI S3   1.5 3
VII S1         4 2.75 2 -2.75
VIII + XV S2       1 4 2.75 2 -1.75
XVI S3           1.5 3  
VII+VIII+XV PS       1 8 5.5 4 -4.5
VII+VIII+XV+XVI RS       1 8 5.5 4 -4.5
IX–XI FS       2.5 0 2.5 4  
  S       5 9.5 9.5 9.5 -4.5
XVIIa ECh1 20.25 22 1.75 5 it.    
XVIIb ECh2 5.5     5.25
XVIIc TXT   na    
XVIId PRG   na    
XVII ECh       1.75 1.5     -0.25
XVIIIa EML1   na    
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out         1.25 2.25 2.75 1.25
XX JR 22 22   0.25     ok
XXI PrB       0.25
I + XIV SLS       8.25 7.75 6.75 6.25 -0.5
I SL 22 7 6 5.5
     
WLS in:   out:   in:   out:  
Walks     CleanUps     -1