D   a   y       L   o   g
Wednesday 4. júla 2007
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F 0.5 5.5 5 7 6 5.5 2
II EX   0.75     ms
III MCh 47 5.5 9.75 2 1.25     -0.75
II–III M       2 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 -2
VIII S2a 1    
IX FP   7.5 8.75 1.25   2.5 4 -1.25
X FA         2.5 4  
XI F   9.75 13 3.25   2.5 4  
XII NCh 13 15 2 2     ok
XIII PrN       0.25     ms
XIV NP 49 6.5 20 3.5 0.75     -2.75
XII–XIV N       5.5 3     -2.5
XV S2b 3 2.75 2 -2
XVI S3 22 25.5 3.5   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3       3.5   1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS       3.5 8 5.5 4 -0.5
IX–XI FS       4.5   2.5 4 -0.5
  S       4.75 9.5 7 5.5 -4.75
XVIIa ECh1 20 22 2 5 it.     -4
XVIIb ECh2 25.5 26.5 1 na W/CU ok ms
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       3 1.5     -1.5
XVIIIa EML1 15 17.5 2.5 na     ms
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       2.5 1.25 2.25 2.75 -1.25
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       8.5 7.75 6.75 6.25 -0.75
I SL 26.5 7 6 5.5
 
6.5 8.75 incl. LT&DN (0.5) M-W-C 4 ok
ok ms 7
7.5 17.5 -3 -3 -1