D   a   y       L   o   g
Friday 6. júla 2007
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F 1 5.5 4.5 7 6 5.5 2.5
II EX   0.75     ms
III MCh 5.5 6 0.5 1.25     0.75
II–III M       0.5 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP est 6 11 5   2.5 4 -1
X FA         2.5 4  
XI F         2.5 4  
XII NCh 13.5 15.25 1.75 2     0.25
XIII PrN       0.25     ms
XIV NP 15.25 18.75 3.5 0.75     -2.75
XII–XIV N       5.25 3     NA
XV S2b 3 2.75 2 ms
XVI S3 47 18.75 26 5.25   1.5 3 -2.25
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3       5.25   1.5 3 -2.25
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS       5.25 8 5.5 4 1.25
IX–XI FS       5   2.5 4 -1
  S       10.25 9.5 7 5.5 0.75
XVIIa ECh1 21 23 2 5 it.     -4
XVIIb ECh2 26 27.75 1.75 na W/CU ok ms
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       3.75 1.5     -2.25
XVIIIa EML1 11 13.5 2.5 na     ms
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       2.5 1.25 2.25 2.75 -1.25
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       8 7.75 6.75 6.25 -0.25
I SL 27.75 7 6 5.5
 
21 23 M-W-C 4 -3
ms ms 6
Ave Wiki Pages & Ave Forum Breakthrough Day -3 -3 1