D   a   y       L   o   g
Wednesday 8. augusta 2007
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -1.5 4.5 6 7 6 5.5 1
II EX   0.75     ms
III MCh 47 6.25 10.5 2 1.25     -0.75
II–III M       2 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP 48 7 18.75 4.25   2.5 4 -4.25
X FA         2.5 4  
XI F   10.5 15 4.5   2.5 4 -0.5
XII NCh 15 15.75 0.75 2     1.25
XIII PrN       0.25     ms
XIV NP 47 8.25 20 0.75 0.75     ok
XII–XIV N       1.5 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       8.75   2.5 4 -4.75
  S       4.25 9.5 7 5.5 -5.25
XVIIa ECh1 20 22.75 2.75 5 it.     -3
XVIIb ECh2 na W/CU ok ms
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       2.75 1.5     -1.25
XVIIIa EML1 49 4.5 9.25 2.5 na     ms
XVIIIb EML2 18.75 19.5 0.75 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       3.25 1.25 2.25 2.75 -2
XX JR 22.75 22.75   0.25     ok
XXI PrB       ms
I + XIV SLS       6.75 7.75 6.75 6.25 1
I SL 22.75 7 6 5.5
     
7 9.25 8.5 19.5 M-W-C 4 -2
8.25 15.75 ok ms 5.5
6.25 8.5 -6 -3 -1