D   a   y       L   o   g
Thursday 9. augusta 2007
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL 47 -1.25 8.5 7.5 7 6 5.5 -0.5
II EX 9 9.75 0.75 0.75     ok
III MCh 48 6.25 11 1.75 1.25     -0.5
II–III M       2.5 2     -0.5
IV FL 12 12.25 0.25 0.25     ok
V PrM   12.25 12.5 0.25 0.25     ok
VI QU 12.5 14 1.5 0.5     -1
IV–VI US       2 1     -1
VII S1 4 2.75 2 ms
VIII S2a 1    
IX FP 49 11.25 16.5 3.25   2.5 4  
X FA         2.5 4  
XI F         2.5 4  
XII NCh 2     ms
XIII PrN       0.25     ms
XIV NP 17 19 2 0.75     -1.25
XII–XIV N       2 3     NA
XV S2b 3 2.75 2 ms
XVI S3 5.25 6.25 1   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3       1   1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS       1 8 5.5 4 -3
IX–XI FS       3.25   2.5 4  
  S       6.25 9.5 7 5.5 -3.25
XVIIa ECh1 20 22.75 2.75 5 it.     -3
XVIIb ECh2 na W/CU ok ms
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       2.75 1.5     -1.25
XVIIIa EML1 47 4.5 9 1.25 na     ms
XVIIIb EML2 48 11 20 1.75 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       3 1.25 2.25 2.75 -1.75
XX JR 22.75 22.75   0.25     ok
XXI PrB       ms
I + XIV SLS       9.5 7.75 6.75 6.25 -1.75
I SL 22.75 7 6 5.5
     
4.5 6.75 5.25 8.5 M-W-C 4 ok
6.75 9.75 11.25 16.5 17 19 ok ms 5.25
12 14 -7 -4 -1