D   a   y       L   o   g
Monday 31. decembra 2007
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -1.75 9.5 11.25 7 6 5.5 -4.25
II EX 15.25 16 0.75 0.75     ok
IIIa MCh 16 20.5 4.5 1.25     -3.25
IIIb MCh PF 100% 100%   4 it. Wght 97.1 -2
II–III M       5.25 2     -3.25
IV FL 21 21.25 0.25 0.25     ok
V PrM   20.75 21 0.25 0.25     ok
VI QU 21.25 21.75 0.5 0.5     ok
IV–VI US       1 1     ok
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD       0 2.5 4  
IXb FP        
X FA        
XI F        
XII NCh 2     ms
XIII PrN       0.25     ms
XIV NP   0.75     ms
XII–XIV N         3     NA
XV S2b 3 2.75 2 ms
XVI S3 9.5 10.25 0.75   1.5 3
VII S1         4 2.75 2 -4
VIII + XV S2         4 2.75 2 -4
XVI S3       0.75   1.5 3  
VII+VIII+XV PS         8 5.5 4 -8
VII+VIII+XV+XVI RS       0.75 8 5.5 4 -7.25
IX–XI FS         0 2.5 4  
  S       2 9.5 9.5 9.5 -7.5
XVIIa ECh1 22 22.25 0.25 5 it.     -3
XVIIb ECh2       5.5
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       0.25 1.5     1.25
XVIIIa EML1 10.25 15.25 5 na     ok
XVIIIb EML2 na    
XIX AL 21.75 22 0.25 1.25 2.25 2.75 1
XVIII–XIX Out       5.25 1.25 2.25 2.75 -4
XX JR 22.25 22.25   0.25     ok
XXI PrB   22.25 22.5 0.25 ok
I + XIV SLS       11.25 7.75 6.75 6.25 -3.5
I SL 22.5 7 6 5.5
     
WLS in: 80% out: 100% in: - out: -
Walks ok ms CleanUps ok ms -1