w
D   a   y       L   o   g
Friday 25. januára 2008
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F 2.5 6.5 4 7 6 5.5 3
II EX   0.75     ms
IIIa MCh 6.5 7.5 1 1.25     0.25
IIIb MCh PF       4 it. Wght 97.2 -3
II–III M       1 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD       0 2.5 4  
IXb FP 51 7.5 15 6.5 -2.5
X FA        
XI F        
XII NCh 2     ms
XIII PrN       0.25     ms
XIV NP 52 9.25 19.75 2.5 0.75     -1.75
XII–XIV N       2.5 3     NA
XV S2b 3 2.75 2 ms
XVI S3 23.75 24.75 1   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3       1   1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS       1 8 5.5 4 -3
IX–XI FS       6.5 0 2.5 4 -2.5
  S       7.5 9.5 9.5 9.5 -2
XVIIa ECh1 19.75 22 2.25 5 it.     -3
XVIIb ECh2 51 24.75 28.75 2 5.5     5.25
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       4.25 1.5     -2.75
XVIIIa EML1 9.5 10.25 0.75 na     ok
XVIIIb EML2 53 15 27.5 6.25 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       7 1.25 2.25 2.75 -5.75
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       6.5 7.75 6.75 6.25 1.25
I SL 28.75 7 6 5.5
     
WLS in: 90% out: 90% in: 90% out: 80%
Walks ms ms CleanUps ms ms -20 -4 -1
9.25 10.25 25.5 27.5
9.5 17.5
17.5 22 23.75 25.5