w
D   a   y       L   o   g
Monday 31. marca 2008
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F 6.5 6.5 7 6 5.5 0.5
II EX   0.75     ms
IIIa MCh 6.5 7.25 0.75 1.25     0.5
IIIb MCh PF       4 it. Wght 100.6 -3
II–III M       0.75 2     1.25
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 19 20.75 1.75 1     0.75
IXa FD   24 27.5 3.5 0 2.5 4 -3.5
IXb FP 51 7.25 24 5.75 -5.75
X FA        
XI F        
XII NCh 14.5 19 4.5 2     -2.5
XIII PrN       0.25     ms
XIV NP 52 9.75 23 3 0.75     -2.25
XII–XIV N       7.5 3     NA
XV S2b 27.5 29.5 2 3 2.75 2 -1
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2       3.75 4 2.75 2 1.75
XVI S3           1.5 3  
VII+VIII+XV PS       3.75 8 5.5 4 -0.25
VII+VIII+XV+XVI RS       3.75 8 5.5 4 -0.25
IX–XI FS       9.25 0 2.5 4 -5.25
  S       9.5 9.5 9.5 9.5  
XVIIa ECh1 5 it.     -4
XVIIb ECh2 5.5     5.25
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh         1.5     1.5
XVIIIa EML1 8.25 9.75 1.5 na     ms
XVIIIb EML2 23 23.25 0.25 na    
XIX AL 1.25 2.25 2.75 ms
XVIII–XIX Out       1.75 1.25 2.25 2.75 -0.5
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       9.5 7.75 6.75 6.25 -1.75
I SL 29.5 7 6 5.5
     
WLS in: 5% out: 5% in: 5% out: 5%
Walks ok ms CleanUps ms ms -28 -1 -1
8.25 10.5 14.5 23.25
10.5 20.75