w
D   a   y       L   o   g
Sunday 20. apríla 2008
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL 51 12.5 7 7 6 5.5 ok
II EX   0.75     ms
IIIa MCh 51 4 13 0.75 1.25     0.5
IIIb MCh PF       4 it. Wght 101.9 -3
II–III M       0.75 2     1.25
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD       0 2.5 4  
IXb FP        
X FA        
XI F        
XII NCh 15.5 16 0.5 2     1.5
XIII PrN       0.25     ms
XIV NP 16 16.5 0.5 0.75     0.25
XII–XIV N       1 3     NA
XV S2b 3 2.75 2 ms
XVI S3 52 4.25 23 11.25   1.5 3 -8.25
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3       11.25   1.5 3 -8.25
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS       11.25 8 5.5 4 3.25
IX–XI FS         0 2.5 4  
  S       11.25 9.5 9.5 9.5 1.75
XVIIa ECh1 19.75 21.5 1.75 5 it.     -3
XVIIb ECh2 23 24 1 5.5     4
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       2.75 1.5     -1.25
XVIIIa EML1 14.75 15.5 0.75 na     ms
XVIIIb EML2 16.5 17 0.5 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       1.25 1.25 2.25 2.75 ok
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       7.5 7.75 6.75 6.25 0.25
I SL 24 7 6 5.5
     
WLS in: 5% out: 5% in: 5% out: 5%
Walks ms ms CleanUps ms ms -16 -3 1
4 9.5 4.25 12.5
9.5 13 14.75 17 19.75 21.5
The 2 Ave Forum Upgrade Days...