w
D   a   y       L   o   g
Thursday 8. mája 2008
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL 1.5 5.5 4 7 6 5.5 3
II EX   0.75     ms
IIIa MCh 51 5.5 15.5 5.75 1.25     -4.5
IIIb MCh PF       4 it. Wght - -3
II–III M       5.75 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 21.75 22.5 0.75 4 2.75 2 -3.25
VIII S2a 1    
IXa FD   18.5 20 1.5 0 2.5 4  
IXb FP        
X FA        
XI F        
XII NCh 17.5 18.5 1 2     1
XIII PrN       0.25     ms
XIV NP 52 7.75 17.5 6.25 0.75     -5.5
XII–XIV N       7.25 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1       0.75 4 2.75 2 -3.25
VIII + XV S2         4 2.75 2 -4
XVI S3           1.5 3  
VII+VIII+XV PS       0.75 8 5.5 4 -7.25
VII+VIII+XV+XVI RS       0.75 8 5.5 4 -7.25
IX–XI FS       1.5 0 2.5 4  
  S       0.75 9.5 9.5 9.5 -8.75
XVIIa ECh1 20 21.75 1.75 5 it.     -3
XVIIb ECh2 5.5     8.5
XVIIc TXT   na     ms
XVIId PRG   na     ms
XVII ECh       1.75 1.5     -0.25
XVIIIa EML1   na     ms
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out         1.25 2.25 2.75 1.25
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       10.25 7.75 6.75 6.25 -2.5
I SL 22.5 7 6 5.5
     
WLS in: 5% out: 5% in: 5% out: 5%
Walks ms ms CleanUps ms ms -2 -1
7.75 9.75 12.5 14.75 DN, LT throughout, at times intense...
9.75 12.5 14.75 15.5
Canada WCh Shock Day