w
D   a   y       L   o   g
Saturday 31. mája 2008
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL 1 10 9 7 6 5.5 -2
II EX 10 10.75 0.75 0.75     ok
IIIa MCh 10.75 14.5 3.75 1.25     -2.5
IIIb MCh PF 100% 100%   4 it. Wght 100.8 -1
II–III M       4.5 2     -2.5
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD       0 2.5 4  
IXb FP        
X FA        
XI F        
XII NCh 15 27 12 2     -10
XIII PrN       0.25     ms
XIV NP   0.75     ms
XII–XIV N       12 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -4
VIII + XV S2         4 2.75 2 -4
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -8
VII+VIII+XV+XVI RS         8 5.5 4 -8
IX–XI FS         0 2.5 4  
  S         9.5 9.5 9.5 -9.5
XVIIa ECh1 5 it.     -2
XVIIb ECh2 5.5     16.5
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh         1.5     NA
XVIIIa EML1   na     ms
XVIIIb EML2 na    
XIX AL 14.5 15 0.5 1.25 2.25 2.75 0.75
XVIII–XIX Out       0.5 1.25 2.25 2.75 0.75
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       9 7.75 6.75 6.25 -1.25
I SL 27 7 6 5.5
     
WLS in: 5% out: 5% in: - out: -
Walks ok ms CleanUps ok ok -9 -4 -1