w
D   a   y       L   o   g
Saturday 14. júna 2008
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL 2.25 11.25 9 7 6 5.5 -2
II EX 11.25 12 0.75 0.75     ok
IIIa MCh 12 13 1 1.25     0.25
IIIb MCh PF       4 it. Wght 99.5 -3
II–III M       1.75 2     0.25
IV FL   0.25     0.25
V PrM       0.25     0.25
VI QU   0.5     0.5
IV–VI US         1     1
VII S1 4 2.75 2 -4
VIII S2a 1     -1
IXa FD       0 2.5 4  
IXb FP        
X FA        
XI F        
XII NCh 13 14.25 1.25 2     0.75
XIII PrN       0.25     0.25
XIV NP   0.75     0.75
XII–XIV N       1.25 3     1.75
XV S2b 3 2.75 2 -3
XVI S3   1.5 3
VII S1         4 2.75 2 -4
VIII + XV S2         4 2.75 2 -4
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -8
VII+VIII+XV+XVI RS         8 5.5 4 -8
IX–XI FS         0 2.5 4  
  S         9.5 9.5 9.5 -9.5
XVIIa ECh1 17 23.5 6.5 5 it.     -2
XVIIb ECh2 5.5     9.5
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       6.5 1.5     -5
XVIIIa EML1   na     ms
XVIIIb EML2 na    
XIX AL 14.25 17 2.75 1.25 2.25 2.75 -1.5
XVIII–XIX Out       2.75 1.25 2.25 2.75 -1.5
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       9 7.75 6.75 6.25 -1.25
I SL 23.5 7 6 5.5
     
WLS in: 5% out: 5% in: - out: -
Walks ok ms CleanUps ms ms -14 -6 -1