w
D   a   y       L   o   g
Wednesday 18. júna 2008
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F 0.25 5.75 5.5 7 6 5.5 1.5
II EX 12 12.75 0.75 0.75     ok
IIIa MCh 52 5.75 14 1.75 1.25     -0.5
IIIb MCh PF       4 it. Wght 100.1 -1
II–III M       2.5 2     -0.5
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD       0 2.5 4  
IXb FP 51 6.25 18.5 4.75 -0.75
X FA        
XI F   17 17.5 0.5 -0.5
XII NCh 14.75 17 2.25 2     -0.25
XIII PrN       0.25     ms
XIV NP 53 8.5 19.75 3 0.75     -2.25
XII–XIV N       5.25 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       5.25 0 2.5 4 -1.25
  S       4.75 9.5 9.5 9.5 -4.75
XVIIa ECh1 18.5 19 0.5 5 it.     -2
XVIIb ECh2 53 19.75 32 12.25 5.5     17.5
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       12.75 1.5     -11.25
XVIIIa EML1 10.75 11 0.25 na     ms
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       0.25 1.25 2.25 2.75 1
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       8.5 7.75 6.75 6.25 -0.75
I SL 32 7 6 5.5
     
WLS in: 25% out: 80% in: 5% out: 5%
Walks ok ok CleanUps ms ms -18 -3 -1
8.5 11 12 14 14.5 17.5
6.25 12.75
10.75 19 extreme & hideous DN, LT