D   a   y       L   o   g
D   a   y       L   o   g
Tuesday 1. júla 2008
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F -1 7 8 7 6 5.5 -1
II EX 7 7.75 0.75 0.75     ok
IIIa MCh 51 7.75 11.75 3 1.25     -1.75
IIIb MCh PF 100%     4 it. Wght 98.4 ok
II–III M       3.75 2     -1.75
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD   9.75 10.75 1 0 2.5 4  
IXb FP   13 14.5 1.5  
X FA        
XI F        
XII NCh 52 12 15.5 2 2     ok
XIII PrN       0.25     ms
XIV NP F 11.75 12 0.25 0.75     0.5
XII–XIV N       2.25 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2.75
VIII + XV S2         4 2.75 2 -2.75
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -5.5
VII+VIII+XV+XVI RS         8 5.5 4 -5.5
IX–XI FS       2.5 0 2.5 4  
  S       1.5 9.5 9.5 9.5 -8
XVIIa ECh1 53 16.5 26 9.5 5 it.     -2
XVIIb ECh2 5.5     15.25
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       9.5 1.5     -8
XVIIIa EML1   na     ms
XVIIIb EML2 na    
XIX AL 15.5 16.5 1 1.25 2.25 2.75 0.25
XVIII–XIX Out       1 1.25 2.25 2.75 0.25
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       8.25 7.75 6.75 6.25 -0.5
I SL 26 7 6 5.5
     
WLS in: 20% out: 20% in: 40% out: 40%
Walks ok ms CleanUps ms ms -1 -2 -1
9.75 10.75
13 14.5
extreme DN, LT