D   a   y       L   o   g
D   a   y       L   o   g
Monday 7. júla 2008
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F -1.75 7 6.75 7 6 5.5 0.25
II EX tn 7 7.75 0.75 0.75     ok
IIIa MCh 7.75 10.5 2.75 1.25     -1.5
IIIb MCh PF 100% 100%   4 it. Wght 98.6 ok
II–III M       3.5 2     -1.5
IV FL 12.75 13 0.25 0.25     ok
V PrM   13 13.25 0.25 0.25     ok
VI QU 13.25 13.75 0.5 0.5     ok
IV–VI US       1 1     ok
VII S1 4 2.75 2 -4
VIII S2a -0.5 1.5 2 1     1
IXa FD   11.5 12 0.5 0 2.5 4 -0.5
IXb FP 52 10.5 14.5 1.75 -1.75
X FA        
XI F        
XII NCh 14.5 17.75 3.25 2     -1.25
XIII PrN   17.75 18 0.25 0.25     ok
XIV NP 53 12 19 1.5 0.75     -0.75
XII–XIV N       5 3     -2
XV S2b 3 2.75 2 -3
XVI S3   1.5 3
VII S1         4 2.75 2 -4
VIII + XV S2       2 4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS       2 8 5.5 4 -6
VII+VIII+XV+XVI RS       2 8 5.5 4 -6
IX–XI FS       2.25 0 2.5 4 -2.25
  S       5 9.5 9.5 9.5 -4.5
XVIIa ECh1 53 19 25.5 6.5 5 it.     -2
XVIIb ECh2 5.5     13.25
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       6.5 1.5     -5
XVIIIa EML1 18 18.25 0.25 na     ms
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       0.25 1.25 2.25 2.75 1
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       8.25 7.75 6.75 6.25 -0.5
I SL 25.5 7 6 5.5
     
WLS in: 60% out: 30% in: 20% out: 20%
Walks ok ok CleanUps ok ms -7 -1 -1
-0.5 1.5
11.5 13.75
12.75 18.25 DN, LT