D   a   y       L   o   g
D   a   y       L   o   g
Wednesday 9. júla 2008
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -2 7.25 9.25 7 6 5.5 -2.25
II EX tn 8.25 9 0.75 0.75     ok
IIIa MCh 51 7.25 10.75 2.75 1.25     -1.5
IIIb MCh PF 50%     4 it. Wght 96.9 ok
II–III M       3.5 2     -1.5
IV FL   0.25     ms
V PrM   10.75 11 0.25 0.25     ok
VI QU   0.5     ms
IV–VI US       0.25 1     NA
VII S1 4 2.75 2 -2
VIII S2a 1    
IXa FD       0 2.5 4  
IXb FP 52 11 19 6 -6
X FA        
XI F   11.5 12 0.5  
XII NCh 16 17.5 1.5 2     0.5
XIII PrN       0.25     ms
XIV NP 20 20.5 0.5 0.75     0.25
XII–XIV N       2 3     NA
XV S2b 3 2.75 2 -2
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       6.5 0 2.5 4 -2.5
  S       6.25 9.5 9.5 9.5 -3.25
XVIIa ECh1 19 20 1 5 it.     -2
XVIIb ECh2 20.5 22.5 2 5.5     8
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       3 1.5     -1.5
XVIIIa EML1   na     ms
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out         1.25 2.25 2.75 1.25
XX JR 22.5 22.5   0.25     ok
XXI PrB       ms
I + XIV SLS       9.75 7.75 6.75 6.25 -2
I SL 22.5 7 6 5.5
     
WLS in: 30% out: 50% in: 60% out: 40%
Walks ok ok CleanUps ok ms -9 -3 -1
8.25 9
11.5 12 16 17.5