D   a   y       L   o   g
D   a   y       L   o   g
Thursday 31. júla 2008
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL 0.5 5 4.5 7 6 5.5 2.5
II EX tn 7 7.75 0.75 0.75     ok
IIIa MCh 51 5 9 3.25 1.25     -2
IIIb MCh PF       4 it. Wght 95.1 -2
II–III M       4 2     -2
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD       0 2.5 4  
IXb FP        
X FA   17.75 19.75 2  
XI F        
XII NCh 15.75 17.75 2 2     ok
XIII PrN       0.25     ms
XIV NP 12.5 14.25 1.75 0.75     -1
XII–XIV N       3.75 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -4
VIII + XV S2         4 2.75 2 -4
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -8
VII+VIII+XV+XVI RS         8 5.5 4 -8
IX–XI FS       2 0 2.5 4 -2
  S         9.5 9.5 9.5 -9.5
XVIIa ECh1 19.75 24.25 4.5 5 it.     -2
XVIIb ECh2 5.5     10.5
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       4.5 1.5     -3
XVIIIa EML1 9 12.5 3.5 na     ok
XVIIIb EML2 14.25 15.75 1.5 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       5 1.25 2.25 2.75 -3.75
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       6.25 7.75 6.75 6.25 1.5
I SL 24.25 7 6 5.5
     
WLS in: 20% out: 90% in: 30% out: 20%
Walks ok ok CleanUps ms ms -18 -2 -1
7 7.75