D   a   y       L   o   g
D   a   y       L   o   g
Friday 1. augusta 2008
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL 0.25 6.5 6.25 7 6 5.5 0.75
II EX cc 10.5 11.25 0.75 0.75     ok
IIIa MCh 51 6.5 12.75 3 1.25     -1.75
IIIb MCh PF 100%     4 it. Wght 95.1 -2
II–III M       3.75 2     -1.75
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD   14 14.5 0.5 0 2.5 4  
IXb FP        
X FA        
XI F        
XII NCh 14.5 16 1.5 2     0.5
XIII PrN       0.25     ms
XIV NP 12.75 14 1.25 0.75     -0.5
XII–XIV N       2.75 3     NA
XV S2b 3 2.75 2 ms
XVI S3 8.5 10.5 2   1.5 3
VII S1         4 2.75 2 -2.75
VIII + XV S2         4 2.75 2 -2.75
XVI S3       2   1.5 3  
VII+VIII+XV PS         8 5.5 4 -5.5
VII+VIII+XV+XVI RS       2 8 5.5 4 -3.5
IX–XI FS       0.5 0 2.5 4  
  S       2 9.5 9.5 9.5 -7.5
XVIIa ECh1 16.75 21.25 4.5 5 it.     -2
XVIIb ECh2 5.5     9.75
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       4.5 1.5     -3
XVIIIa EML1 8 8.5 0.5 na     ms
XVIIIb EML2 na    
XIX AL 16 16.75 0.75 1.25 2.25 2.75 0.5
XVIII–XIX Out       1.25 1.25 2.25 2.75 ok
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       7.5 7.75 6.75 6.25 0.25
I SL 21.25 7 6 5.5
     
WLS in: 15% out: 10% in: 5% out: 5%
Walks ok ms CleanUps ms ms -1 -3 -1
8 11.25 incl. 0.5 Self-LT