D   a   y       L   o   g
D   a   y       L   o   g
Tuesday 5. augusta 2008
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -1.25 7.25 8.5 7 6 5.5 -1.5
II EX 7.25 8 0.75 0.75     ok
IIIa MCh 51 8 11.5 1.75 1.25     -0.5
IIIb MCh PF 100% 100%   4 it. Wght 94.4 ok
II–III M       2.5 2     -0.5
IV FL 10.25 10.5 0.25 0.25     ok
V PrM   10.5 10.75 0.25 0.25     ok
VI QU 10.75 11.25 0.5 0.5     ok
IV–VI US       1 1     ok
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD   13.75 16 2.25 0 2.5 4 -0.25
IXb FP 53 9.5 23.25 2  
X FA        
XI F   11.5 12.25 0.75 -0.75
XII NCh 52 12.25 18.75 4.25 2     -2.25
XIII PrN   18.75 19 0.25 0.25     ok
XIV NP   0.75     ms
XII–XIV N       4.5 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       5 0 2.5 4 -1
  S       3.25 9.5 9.5 9.5 -6.25
XVIIa ECh1 19.75 22 2.25 5 it.     -2
XVIIb ECh2 5.5     9
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       2.25 1.5     -0.75
XVIIIa EML1 19 19.75 0.75 na     ok
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       0.75 1.25 2.25 2.75 0.5
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       8.5 7.75 6.75 6.25 -0.75
I SL 23.25 7 6 5.5
     
WLS in: 80% out: 30% in: - out: -
Walks ok ok CleanUps ok ms -3 1
9.5 11.25
13.75 16
10.25 22