D   a   y       L   o   g
D   a   y       L   o   g
Friday 8. augusta 2008
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -0.5 7.25 7.75 7 6 5.5 -0.75
II EX tn 7.75 8.5 0.75 0.75     ok
IIIa MCh 8.5 11.5 3 1.25     -1.75
IIIb MCh PF 100% 100% 100% 4 it. Wght 94.4 ok
II–III M       3.75 2     -1.75
IV FL   0.25     ms
V PrM   11.5 11.75 0.25 0.25     ok
VI QU   0.5     ms
IV–VI US       0.25 1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD   17.75 18 0.25 0 2.5 4 -0.25
IXb FP 51 11.75 17.75 4.75 -0.75
X FA        
XI F        
XII NCh 12.75 13.5 0.75 2     1.25
XIII PrN       0.25     ms
XIV NP   0.75     ms
XII–XIV N       0.75 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       5 0 2.5 4 -1
  S       5 9.5 9.5 9.5 -4.5
XVIIa ECh1 18 23.25 5.25 5 it.     -2
XVIIb ECh2 5.5     9.75
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       5.25 1.5     -3.75
XVIIIa EML1 7.25 7.75 0.5 na     ok
XVIIIb EML2 13.5 14 0.5 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       1 1.25 2.25 2.75 0.25
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       7.75 7.75 6.75 6.25  
I SL 23.25 7 6 5.5
     
WLS in: 10% out: 10% in: - out: -
Walks ok ok CleanUps ms ms -6 -3 -1
12.75 14