D   a   y       L   o   g
D   a   y       L   o   g
Friday 22. augusta 2008
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -1.75 5 6.75 7 6 5.5 0.25
II EX tn 7.5 8.25 0.75 0.75     ok
IIIa MCh 51 5 9 2 1.25     -0.75
IIIb MCh PF 100% 100%   4 it. Wght 91.3 ok
II–III M       2.75 2     -0.75
IV FL 6.5 6.75 0.25 0.25     ok
V PrM   6.75 7 0.25 0.25     ok
VI QU   0.5     ms
IV–VI US       0.5 1     NA
VII S1 4 2.75 2 -2
VIII S2a 1    
IXa FD       0 2.5 4  
IXb FP 53 13.5 20.5 3.25  
X FA        
XI F   9 12.5 3.5 -2.75
XII NCh 51 12.5 17.25 3.5 2     -1.5
XIII PrN   17.25 17.5 0.25 0.25     ok
XIV NP F 7 18.5 1.5 0.75     -0.75
XII–XIV N       5.25 3     -2.25
XV S2b 3 2.75 2 -2
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       6.75 0 2.5 4 -2.75
  S       4 9.5 9.5 9.5 -5.5
XVIIa ECh1 20.5 23 2.5 5 it.     -3
XVIIb ECh2 5.5     8.75
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       2.5 1.5     -1
XVIIIa EML1 8.25 8.5 0.25 na     ok
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       0.25 1.25 2.25 2.75 1
XX JR nx   0.25     ok
XXI PrB       ms
I + XIV SLS       8.25 7.75 6.75 6.25 -0.5
I SL 23 7 6 5.5
     
WLS in: 90% out: 10% in: 40% out: 50%
Walks ok ok CleanUps ok ok -13 -3 1
6.5 8.5 13.5 14.75
7.5 17.5
14.75 18.5