D   a   y       L   o   g
D   a   y       L   o   g
Thursday 28. augusta 2008
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F 0.5 5.75 5.25 7 6 5.5 1.75
II EX   0.75     ms
IIIa MCh 51 5.75 7.75 1.25 1.25     ok
IIIb MCh PF       4 it. Wght 91.3 -3
II–III M       1.25 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD   14.75 15 0.25 0 2.5 4 -0.25
IXb FP 52 7.75 17.5 7.5 -3.5
X FA        
XI F        
XII NCh 53 16.25 20.75 3.5 2     -1.5
XIII PrN       0.25     ms
XIV NP 52 6.5 16.25 1.5 0.75     -0.75
XII–XIV N       5 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       7.75 0 2.5 4 -3.75
  S       7.5 9.5 9.5 9.5 -2
XVIIa ECh1 5 it.     -3
XVIIb ECh2 5.5     4.75
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh         1.5     1.5
XVIIIa EML1 15 15.5 0.5 na     ms
XVIIIb EML2 16.5 17 0.5 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       1 1.25 2.25 2.75 0.25
XX JR nx   0.25     ok
XXI PrB       ms
I + XIV SLS       6.75 7.75 6.75 6.25 1
I SL 20.75 7 6 5.5
     
WLS in: 50% out: 75% in: 20% out: 10%
Walks ok ms CleanUps ms ms -17 -2 1
6.5 7.25 2nd Segment inlcudes 0.25 of auto-LT
7.25 15.5 14.75 17
16.5 17.5