D   a   y       L   o   g
D   a   y       L   o   g
Thursday 4. septembra 2008
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F -1.5 4 5.5 7 6 5.5 1.5
II EX   0.75     ms
IIIa MCh 52 4 13.25 1.5 1.25     -0.25
IIIb MCh PF       4 it. Wght 91.5 ok
II–III M       1.5 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD       0 2.5 4  
IXb FP 51 5.75 19 9 -5
X FA        
XI F   16.25 16.75 0.5 -0.5
XII NCh 13.25 16.25 3 2     -1
XIII PrN       0.25     ms
XIV NP 5 5.75 0.75 0.75     ok
XII–XIV N       3.75 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       9.5 0 2.5 4 -5.5
  S       9 9.5 9.5 9.5 -0.5
XVIIa ECh1 19 22.75 3.75 5 it.     -3
XVIIb ECh2 5.5     8.25
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       3.75 1.5     -2.25
XVIIIa EML1 12.5 12.75 0.25 na     ok
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       0.25 1.25 2.25 2.75 1
XX JR nx   0.25     ok
XXI PrB       ms
I + XIV SLS       6.25 7.75 6.75 6.25 1.5
I SL 22.75 7 6 5.5
     
WLS in: 60% out: 80% in: 40% out: 25%
Walks ok ok CleanUps ms ms -2 -2 -1
12.5 16.75
5 12.75