D   a   y       L   o   g
D   a   y       L   o   g
Monday 8. septembra 2008
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F -1.75 5.25 7 7 6 5.5 ok
II EX 11.25 12 0.75 0.75     ok
IIIa MCh 51 5.25 13.5 3.5 1.25     -2.25
IIIb MCh PF 50% 100%   4 it. Wght 89.9 ok
II–III M       4.25 2     -2.25
IV FL   0.25     ms
V PrM   9.75 10 0.25 0.25     ok
VI QU   0.5     ms
IV–VI US       0.25 1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD 53 19.75 25.5 4.5 0 2.5 4 -3.75
IXb FP 53 6.5 17 3.25  
X FA        
XI F        
XII NCh 13.5 15.5 2 2    
XIII PrN       0.25     0.25
XIV NP 10 11.25 1.25 0.75     -0.5
XII–XIV N       3.25 3     -0.25
XV S2b 3 2.75 2 -3
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       7.75 0 2.5 4 -3.75
  S       3.5 9.5 9.5 9.5 -6
XVIIa ECh1 18 19.75 1.75 5 it.     -2
XVIIb ECh2 51 21.75 26 1.25 5.5     9.25
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       3 1.5     -1.5
XVIIIa EML1 52 8.25 12.5 0.75 na     ms
XVIIIb EML2 52 17 23 1.5 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       2.25 1.25 2.25 2.75 -1
XX JR nx   0.25     ok
XXI PrB       ms
I + XIV SLS       8.25 7.75 6.75 6.25 -0.5
I SL 26 7 6 5.5
     
WLS in: 80% out: 20% in: 70% out: 25%
Walks ok ok CleanUps ms ms -6 -1 -1
6.5 8.5 9.75 12.5 22.5 25.5
8.5 12 18 22.5
8.25 15.5 21.75 23