D   a   y       L   o   g
D   a   y       L   o   g
Saturday 20. septembra 2008
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F -0.5 8.25 8.75 7 6 5.5 -1.75
II EX tn 8.25 9 0.75 0.75     ok
IIIa MCh 11.5 15 3.5 1.25     -2.25
IIIb MCh PF 100% 100%   4 it. Wght 88.2 -1
II–III M       4.25 2     -2.25
IV FL   0.25     ms
V PrM   15 15.25 0.25 0.25     ok
VI QU   0.5     0.5
IV–VI US       0.25 1     NA
VII S1 4 2.75 2 ms
VIII S2a 15.25 15.75 0.5 1     -0.5
IXa FD   10 11.5 1.5 0 2.5 4  
IXb FP        
X FA        
XI F        
XII NCh 15.75 19 3.25 2     -1.25
XIII PrN   19 19.25 0.25 0.25     ok
XIV NP   0.75     ms
XII–XIV N       3.5 3     NA
XV S2b 3 2.75 2 ms
XVI S3 9.75 10 0.25   1.5 3
VII S1         4 2.75 2 -2.75
VIII + XV S2       0.5 4 2.75 2 -2.25
XVI S3       0.25   1.5 3  
VII+VIII+XV PS       0.5 8 5.5 4 -5
VII+VIII+XV+XVI RS       0.75 8 5.5 4 -4.75
IX–XI FS       1.5 0 2.5 4  
  S       1.25 9.5 9.5 9.5 -8.25
XVIIa ECh1 5 it.     -3
XVIIb ECh2 5.5     7.5
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh         1.5     1.5
XVIIIa EML1 9 9.75 0.75 na     ms
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       0.75 1.25 2.25 2.75 0.5
XX JR nx   0.25     ok
XXI PrB       ms
I + XIV SLS       8.75 7.75 6.75 6.25 -1
I SL 19.25 7 6 5.5
     
WLS in: 80% out: 100% in: - out: -
Walks ok ok CleanUps ok ms -16 -6 -1