D   a   y       L   o   g
D   a   y       L   o   g
Monday 29. septembra 2008
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL 51 10.5 10 7 6 5.5 -3
II EX 11.5 12.25 0.75 0.75     ok
IIIa MCh 12.25 13.75 1.5 1.25     -0.25
IIIb MCh PF       4 it. Wght 87.7 -1
II–III M       2.25 2     -0.25
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD   20.5 22 1.5 0 2.5 4  
IXb FP   11.25 11.5 0.25  
X FA        
XI F        
XII NCh 13.75 15 1.25 2     0.75
XIII PrN       0.25     ms
XIV NP   0.75     ms
XII–XIV N       1.25 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -4
VIII + XV S2         4 2.75 2 -4
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -8
VII+VIII+XV+XVI RS         8 5.5 4 -8
IX–XI FS       1.75 0 2.5 4  
  S       0.25 9.5 9.5 9.5 -9.25
XVIIa ECh1 22 24 2 5 it.     -2
XVIIb ECh2 26.75 27.75 1 5.5     6.5
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       3 1.5     -1.5
XVIIIa EML1 51 9.5 11.25 1.25 na     ok
XVIIIb EML2 52 15 26.75 8.25 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       9.5 1.25 2.25 2.75 -8.25
XX JR 27.75 27.75   0.25     ok
XXI PrB       ms
I + XIV SLS       10 7.75 6.75 6.25 -2.25
I SL 27.75 7 6 5.5
     
WLS in: 100% out: 25% in: - out: -
Walks ok ms CleanUps ok ms -25 -1 -1
9.5 10 10 10.5
20.5 24