D   a   y       L   o   g
D   a   y       L   o   g
Tuesday 30. septembra 2008
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F 3.75 6.25 2.5 7 6 5.5 4.5
II EX tn 6.25 7 0.75 0.75     ok
IIIa MCh 7 9 2 1.25     -0.75
IIIb MCh PF 100% 100%   4 it. Wght 88.1 ok
II–III M       2.75 2     -0.75
IV FL   0.25     ms
V PrM   12.25 12.5 0.25 0.25     ok
VI QU   0.5     ms
IV–VI US       0.25 1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD   25.5 26 0.5 0 2.5 4  
IXb FP 51 12.75 25.5 1  
X FA        
XI F   14.75 16 1.25  
XII NCh 52 13 17.75 3.5 2     -1.5
XIII PrN   17.75 18 0.25 0.25     ok
XIV NP 52 9 18.25 3.5 0.75     -2.75
XII–XIV N       7.25 3     -4.25
XV S2b 19.5 21.5 2 3 2.75 2
XVI S3   1.5 3
VII S1         4 2.75 2 -2.75
VIII + XV S2       2 4 2.75 2 -0.75
XVI S3           1.5 3  
VII+VIII+XV PS       2 8 5.5 4 -3.5
VII+VIII+XV+XVI RS       2 8 5.5 4 -3.5
IX–XI FS       2.75 0 2.5 4  
  S       3.5 9.5 9.5 9.5 -6
XVIIa ECh1 18.25 19.5 1.25 5 it.     -3
XVIIb ECh2 21.5 23.25 1.75 5.5     9.25
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       3 1.5     -1.5
XVIIIa EML1 12.5 12.75 0.25 na     ok
XVIIIb EML2 23.25 24.75 1.5 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       1.75 1.25 2.25 2.75 -0.5
XX JR 26 26   0.25     ok
XXI PrB       ms
I + XIV SLS       6 7.75 6.75 6.25 1.75
I SL 26 7 6 5.5
     
WLS in: 90% out: 100% in: 70% out: 70%
Walks ok ok CleanUps ok ms -26 -2 -1
13 24.75
12.25 18 14.75 16 includes DN from Exhaustion....