D   a   y       L   o   g
D   a   y       L   o   g
Friday 5. decembra 2008
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL 1.75 6.5 4.75 7 6 5.5 2.25
II EX   0.75     ms
IIIa MCh 51 6.5 8 1.5 1.25     -0.25
IIIb MCh PF       4 it. Wght 92.0 -3
II–III M       1.5 2     0.5
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD 51 13.25 21 7.75 0 2.5 4 -3.75
IXb FP 51 10.5 13 2.5 -2.5
X FA        
XI F        
XII NCh 52 13 13.25 0.25 2     1.75
XIII PrN       0.25     ms
XIV NP   0.75     0.75
XII–XIV N       0.25 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       10.25 0 2.5 4 -6.25
  S       2.5 9.5 9.5 9.5 -7
XVIIa ECh1 21 24 3 5 it.     -4
XVIIb ECh2 5.5     4.75
XVIIc TXT   na     ms
XVIId PRG   na     ok
XVII ECh       3 1.5     -1.5
XVIIIa EML1 51 8 10.5 2.5 na     ok
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       2.5 1.25 2.25 2.75 -1.25
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       4.75 7.75 6.75 6.25 3
I SL 24 7 6 5.5
     
WLS in: 75% out: 5% in: out:
Walks ms ms CleanUps ms ms -5 -5 -1
DN Conjectures
LT, DN