D   a   y       L   o   g
D   a   y       L   o   g
Thursday 1. januára 2009
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL 3.25 13.5 10.25 7 6 5.5 -3.25
II EX   0.75     ms
IIIa MCh 13.5 15 1.5 1.25     -0.25
IIIb MCh PF       4 it. Wght 94.8 -3
II–III M       1.5 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD 51 15 24.5 6.25 0 2.5 4 -2.25
IXb FP        
X FA        
XI F        
XII NCh 2     ms
XIII PrN       0.25     ms
XIV NP   0.75     ms
XII–XIV N         3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       6.25 0 2.5 4 -2.25
  S         9.5 9.5 9.5 -9.5
XVIIa ECh1 20.5 23 2.5 5 it.     -3
XVIIb ECh2 5.5     4
XVIIc TXT   na     ok
XVIId PRG   na     ok
XVII ECh       2.5 1.5     -1
XVIIIa EML1 23.5 24 0.5 na     ms
XVIIIb EML2 na    
XIX AL 23 23.25 0.25 1.25 2.25 2.75 1
XVIII–XIX Out       0.75 1.25 2.25 2.75 0.5
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       10.25 7.75 6.75 6.25 -2.5
I SL 24.5 7 6 5.5
     
WLS in: 10% out: 5% in: out:
Walks ms ms CleanUps ms ms -1 -1
20.5 23.25 23.5 24