D   a   y       L   o   g
D   a   y       L   o   g
Friday 2. januára 2009
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL 0.5 5.5 5 7 6 5.5 2
II EX   0.75     ms
IIIa MCh 7.75 9 1.25 1.25     ok
IIIb MCh PF       4 it. Wght 96.8 -2
II–III M       1.25 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 -2
VIII S2a 1    
IXa FD 51 6 20 7.75 0 2.5 4 -3.75
IXb FP        
X FA        
XI F        
XII NCh 2     2
XIII PrN       0.25     ms
XIV NP 9 12.5 3.5 0.75     -2.75
XII–XIV N       3.5 3     NA
XV S2b 21.5 23.5 2 3 2.75 2
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2       2 4 2.75 2  
XVI S3           1.5 3  
VII+VIII+XV PS       2 8 5.5 4 -2
VII+VIII+XV+XVI RS       2 8 5.5 4 -2
IX–XI FS       7.75 0 2.5 4 -3.75
  S       2 9.5 9.5 9.5 -7.5
XVIIa ECh1 20 21.5 1.5 5 it.     -3
XVIIb ECh2 23.5 24.25 0.75 5.5     3.5
XVIIc TXT   na     ms
XVIId PRG   na     ok
XVII ECh       2.25 1.5     -0.75
XVIIIa EML1 52 5.5 13.75 1.75 na     ms
XVIIIb EML2 na    
XIX AL 13.75 14 0.25 1.25 2.25 2.75 1
XVIII–XIX Out       2 1.25 2.25 2.75 -0.75
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       8.5 7.75 6.75 6.25 -0.75
I SL 24.25 7 6 5.5
     
WLS in: 10% out: 10% in: 10% out: 5%
Walks ms ok CleanUps ms ms 1 1
7.75 14
6 12.5