D   a   y       L   o   g
D   a   y       L   o   g
Saturday 3. januára 2009
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL 0.25 9.25 9 7 6 5.5 -2
II EX   0.75     ms
IIIa MCh 47 10.5 12.75 2.25 1.25     -1
IIIb MCh PF       4 it. Wght 95.4 -3
II–III M       2.25 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD 52 13.25 25.75 4.5 0 2.5 4 -0.5
IXb FP        
X FA   16.5 16.75 0.25 -0.25
XI F        
XII NCh 14.75 16.5 1.75 2     0.25
XIII PrN       0.25     ms
XIV NP   0.75     ms
XII–XIV N       1.75 3     NA
XV S2b 21.5 23 1.5 3 2.75 2 -1.5
XVI S3 10 10.5 0.5   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2       1.5 4 2.75 2 -0.5
XVI S3       0.5   1.5 3  
VII+VIII+XV PS       1.5 8 5.5 4 -2.5
VII+VIII+XV+XVI RS       2 8 5.5 4 -2
IX–XI FS       4.75 0 2.5 4 -0.75
  S       2.25 9.5 9.5 9.5 -7.25
XVIIa ECh1 20 21 1 5 it.     -3
XVIIb ECh2 51 23 26 2.25 5.5     7.25
XVIIc TXT   na     ok
XVIId PRG   na     ok
XVII ECh       3.25 1.5     -1.75
XVIIIa EML1 9.25 10 0.75 na     ms
XVIIIb EML2 53 12.75 20 1.5 na    
XIX AL 21 21.5 0.5 1.25 2.25 2.75 0.75
XVIII–XIX Out       2.75 1.25 2.25 2.75 -1.5
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       9 7.75 6.75 6.25 -1.25
I SL 26 7 6 5.5
     
WLS in: 10% out: 35% in: out:
Walks ms ms CleanUps ms ms -1 -1
incl. LT 25 25.75
14.75 16.75 19 25
13.25 19