D   a   y       L   o   g
D   a   y       L   o   g
Sunday 4. januára 2009
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL 2 10.5 8.5 7 6 5.5 -1.5
II EX   0.75     ms
IIIa MCh 10.5 11.25 0.75 1.25     0.5
IIIb MCh PF       4 it. Wght 94.9 -3
II–III M       0.75 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     NA
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD 51 11.25 24.25 7.5 0 2.5 4 -3.5
IXb FP        
X FA        
XI F        
XII NCh 14 14.75 0.75 2     1.25
XIII PrN       0.25     ms
XIV NP   0.75     0.75
XII–XIV N       0.75 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       7.5 0 2.5 4 -3.5
  S         9.5 9.5 9.5 -9.5
XVIIa ECh1 20 23 3 5 it.     -3
XVIIb ECh2 24.25 24.5 0.25 5.5     4.75
XVIIc TXT   na     ok
XVIId PRG   na     ok
XVII ECh       3.25 1.5     -1.75
XVIIIa EML1 19.25 20 0.75 na     ms
XVIIIb EML2 23 24 1 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       1.75 1.25 2.25 2.75 -0.5
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       8.5 7.75 6.75 6.25 -0.75
I SL 24.5 7 6 5.5
     
WLS in: 20% out: 10% in: out:
Walks ms ms CleanUps ms ms -2 -1 -1
14 14.75 19.25 24