D   a   y       L   o   g
D   a   y       L   o   g
Monday 5. januára 2009
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL 0.5 8.25 7.75 7 6 5.5 -0.75
II EX   0.75     ms
IIIa MCh 9.5 11.5 2 1.25     -0.75
IIIb MCh PF       4 it. Wght 95.4 -1
II–III M       2 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD 51 11.5 15.75 2.5 0 2.5 4  
IXb FP        
X FA        
XI F   19.5 21 1.5  
XII NCh 53 12.75 16.5 1.75 2     0.25
XIII PrN       0.25     ms
XIV NP 14.5 15 0.5 0.75     0.25
XII–XIV N       2.25 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       4 0 2.5 4  
  S         9.5 9.5 9.5 -9.5
XVIIa ECh1 19.25 19.5 0.25 5 it.     -3
XVIIb ECh2 52 21 27 3.5 5.5     7.5
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       3.75 1.5     -2.25
XVIIIa EML1 8.25 9.5 1.25 na     ms
XVIIIb EML2 52 16.5 25 5.25 na    
XIX AL 15 15.25 0.25 1.25 2.25 2.75 1
XVIII–XIX Out       6.75 1.25 2.25 2.75 -5.5
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       8.25 7.75 6.75 6.25 -0.5
I SL 27 7 6 5.5
     
WLS in: 10% out: 10% in: 50% out: 50%
Walks ms ms CleanUps ms ms -3 -1 -1
12.75 13.75 14.5 15.25
19.25 22.5 22.5 25
13.75 15.75