D   a   y       L   o   g
D   a   y       L   o   g
Tuesday 6. januára 2009
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL 3 10.5 7.5 7 6 5.5 -0.5
II EX   0.75     ms
IIIa MCh 10.5 11.25 0.75 1.25     0.5
IIIb MCh PF       4 it. Wght 97.0 -3
II–III M       0.75 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD 51 11.25 25.25 4 0 2.5 4 -2.25
IXb FP   18.75 19.5 0.75  
X FA        
XI F   19.5 21 1.5  
XII NCh 52 13.75 18.75 3.5 2     -1.5
XIII PrN       0.25     ms
XIV NP 16.25 17.75 1.5 0.75     -0.75
XII–XIV N       5 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       6.25 0 2.5 4 -2.25
  S       0.75 9.5 9.5 9.5 -8.75
XVIIa ECh1 21 22.5 1.5 5 it.     -3
XVIIb ECh2 25.25 25.75 0.5 5.5     6.25
XVIIc TXT   na     ms
XVIId PRG   na     ok
XVII ECh       2 1.5     -0.5
XVIIIa EML1 22.5 23.75 1.25 na     ms
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       1.25 1.25 2.25 2.75 ok
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       9 7.75 6.75 6.25 -1.25
I SL 25.75 7 6 5.5
     
WLS in: 10% out: 10% in: 10% out: 10%
Walks ms ms CleanUps ms ms -4 -2 -1
13.75 23.75
16.25 17.75 last 0.5 of 1st Part = LT