D   a   y       L   o   g
D   a   y       L   o   g
Wednesday 7. januára 2009
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL 1.75 10.5 8.75 7 6 5.5 -1.75
II EX   0.75     ms
IIIa MCh 47 11.25 11.75 0.5 1.25     0.75
IIIb MCh PF       4 it. Wght 96.5 -4
II–III M       0.5 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD 52 12.25 23.75 5 0 2.5 4 -1
IXb FP 53 11.75 19.5 1 -1
X FA        
XI F   19.5 21 1.5 -1.5
XII NCh 53 14.25 19 2.75 2     -0.75
XIII PrN       0.25     ms
XIV NP   0.75     ms
XII–XIV N       2.75 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       7.5 0 2.5 4 -3.5
  S       1 9.5 9.5 9.5 -8.5
XVIIa ECh1 21 22 1 5 it.     -3
XVIIb ECh2 23.75 24 0.25 5.5     4.5
XVIIc TXT   na     ok
XVIId PRG   na     ok
XVII ECh       1.25 1.5     0.25
XVIIIa EML1 51 10.5 14.25 1.5 na     ms
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       1.5 1.25 2.25 2.75 -0.25
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       8.75 7.75 6.75 6.25 -1
I SL 24 7 6 5.5
     
WLS in: 10% out: 10% in: out:
Walks ms ms CleanUps ms ms -5 -3 -1
LT   11.25 13.5
13.5 16 18 22
16 18 12.25 19