D   a   y       L   o   g
D   a   y       L   o   g
Thursday 8. januára 2009
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL 7.75 7.75 7 6 5.5 -0.75
II EX   0.75     ms
IIIa MCh 8.75 10.75 2 1.25     -0.75
IIIb MCh PF       4 it. Wght 96.5 ok
II–III M       2 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD       0 2.5 4  
IXb FP   18.75 19.5 0.75 -0.75
X FA 51 8.25 15.5 5.25 -1.25
XI F   19.5 21 1.5 -1.5
XII NCh 52 15.5 18.75 2.25 2     -0.25
XIII PrN       0.25     ms
XIV NP   0.75     ms
XII–XIV N       2.25 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       7.5 0 2.5 4 -3.5
  S       0.75 9.5 9.5 9.5 -8.75
XVIIa ECh1 16.5 17.5 1 5 it.     -4
XVIIb ECh2 53 21 27 6 5.5     11.25
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       7 1.5     -5.5
XVIIIa EML1 7.75 8.25 0.5 na     ms
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       0.5 1.25 2.25 2.75 0.75
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       7.75 7.75 6.75 6.25  
I SL 27 7 6 5.5
     
WLS in: 10% out: 50% in: out:
Walks ms ms CleanUps ms ms -6 -4 -1
8.75 10.75
16.5 17.5
DN, LT