D   a   y       L   o   g
D   a   y       L   o   g
Saturday 10. januára 2009
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -0.25 9.5 9.75 7 6 5.5 -2.75
II EX   0.75     ms
IIIa MCh 52 9.5 11.25 1.25 1.25     ok
IIIb MCh PF       4 it. Wght 96.5 -3
II–III M       1.25 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD 51 10.25 23.25 8.75 0 2.5 4 -4.75
IXb FP        
X FA        
XI F        
XII NCh 2     ms
XIII PrN       0.25     ms
XIV NP 11.25 13 1.75 0.75     -1
XII–XIV N       1.75 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       8.75 0 2.5 4 -4.75
  S         9.5 9.5 9.5 -9.5
XVIIa ECh1 21.25 23 1.75 5 it.     -4
XVIIb ECh2 23.25 23.5 0.25 5.5     3.25
XVIIc TXT   na     ok
XVIId PRG   na     ok
XVII ECh       2 1.5     -0.5
XVIIIa EML1 21 21.25 0.25 na     ms
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       0.25 1.25 2.25 2.75 1
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       11.5 7.75 6.75 6.25 -3.75
I SL 23.5 7 6 5.5
     
WLS in: 10% out: 90% in: 5% out: 5%
Walks ms ms CleanUps ms ms -8 -6 -1
10.75 13 21 23
10.25 10.75 2nd Part = sad LT