D   a   y       L   o   g
D   a   y       L   o   g
Sunday 11. januára 2009
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -0.5 5.75 6.25 7 6 5.5 0.75
II EX   0.75     ms
IIIa MCh 7 8 1 1.25     0.25
IIIb MCh PF       4 it. Wght 96.9 -3
II–III M       1 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD 51 8 23.5 9.75 0 2.5 4 -5.75
IXb FP        
X FA        
XI F        
XII NCh 17 17.75 0.75 2     1.25
XIII PrN       0.25     ms
XIV NP 52 8.25 19.75 4.25 0.75     -3.5
XII–XIV N       5 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       9.75 0 2.5 4 -5.75
  S         9.5 9.5 9.5 -9.5
XVIIa ECh1 53 20.75 21.25 0.5 5 it.     -3
XVIIb ECh2 23.5 25 1.5 5.5     3.75
XVIIc TXT   na     ok
XVIId PRG   na     ok
XVII ECh       2 1.5     -0.5
XVIIIa EML1 5.75 7 1.25 na     ms
XVIIIb EML2 11.75 12 0.25 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       1.5 1.25 2.25 2.75 -0.25
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       10.5 7.75 6.75 6.25 -2.75
I SL 25 7 6 5.5
     
WLS in: 10% out: 65% in: 10% out: 5%
Walks ms ms CleanUps ms ms -9 -7 -1
8.25 12 17 17.75 19 19.75 20.75 21.25
11.75 19
LT