D   a   y       L   o   g
D   a   y       L   o   g
Wednesday 14. januára 2009
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F -0.75 7 7.75 7 6 5.5 -0.75
II EX   0.75     ms
IIIa MCh 53 7 13.5 1 1.25     0.25
IIIb MCh PF       4 it. Wght 96.9 -1
II–III M       1 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD 51 16 18.75 2.25 0 2.5 4 -2.25
IXb FP 52 7.5 19.25 4.5 -0.5
X FA        
XI F   19.25 20.75 1.5 -1.5
XII NCh 13.5 15.5 2 2     ok
XIII PrN       0.25     ms
XIV NP 53 11.5 17 2 0.75     -1.25
XII–XIV N       4 3     -1
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       8.25 0 2.5 4 -4.25
  S       4.5 9.5 9.5 9.5 -5
XVIIa ECh1 51 20.75 23.75 3 5 it.     -4
XVIIb ECh2 5.5     6
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       3 1.5     -1.5
XVIIIa EML1 15.5 16 0.5 na     ms
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out       0.5 1.25 2.25 2.75 0.75
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       9.75 7.75 6.75 6.25 -2
I SL 23.75 7 6 5.5
     
WLS in: 10% out: 50% in: 40% out: 65%
Walks ok ms CleanUps ms ms -12 -3 -1
16.5 17 almost the whole last 2 Hours = LT
11.5 18.75
7.5 13 13 16.5