D   a   y       L   o   g
D   a   y       L   o   g
Friday 16. januára 2009
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F -1.25 8 9.25 7 6 5.5 -2.25
II EX   0.75     ms
IIIa MCh 53 8 10.5 1.5 1.25     -0.25
IIIb MCh PF       4 it. Wght 97.3 -3
II–III M       1.5 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD 51 12 18 4.5 0 2.5 4 -0.5
IXb FP 52 8.5 19 3.5 -3.5
X FA        
XI F   19.5 21 1.5 -1.5
XII NCh 53 13.5 19.5 2 2     ok
XIII PrN       0.25     ms
XIV NP   0.75     ms
XII–XIV N       2 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       9.5 0 2.5 4 -5.5
  S       3.5 9.5 9.5 9.5 -6
XVIIa ECh1 21 23.25 2.25 5 it.     -3
XVIIb ECh2 5.5     5.75
XVIIc TXT   na     ms
XVIId PRG   na     ok
XVII ECh       2.25 1.5     -0.75
XVIIIa EML1 23.25 23.5 0.25 na     ms
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       0.25 1.25 2.25 2.75 1
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       9.25 7.75 6.75 6.25 -1.5
I SL 23.5 7 6 5.5
     
WLS in: 10% out: 90% in: out:
Walks ok ms CleanUps ms ms -14 -5 -1
13.5 15
9.5 10.5 12 18
8.5 9.5 15 19