D   a   y       L   o   g
D   a   y       L   o   g
Sunday 18. januára 2009
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL 3 9.75 6.75 7 6 5.5 0.25
II EX   0.75     ms
IIIa MCh 9.75 10.25 0.5 1.25     0.75
IIIb MCh PF       4 it. Wght 97.8 -3
II–III M       0.5 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD   10.25 15.5 5.25 0 2.5 4 -1.25
IXb FP   17.75 21.25 3.5 -3.5
X FA        
XI F        
XII NCh 16 17.75 1.75 2     0.25
XIII PrN       0.25     ms
XIV NP   0.75     ms
XII–XIV N       1.75 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       8.75 0 2.5 4 -4.75
  S       3.5 9.5 9.5 9.5 -6
XVIIa ECh1 21.75 23 1.25 5 it.     -3
XVIIb ECh2 5.5     3.5
XVIIc TXT   na     ok
XVIId PRG   na     ok
XVII ECh       1.25 1.5     0.25
XVIIIa EML1 15.5 16 0.5 na     ms
XVIIIb EML2 21.25 21.75 0.5 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       1 1.25 2.25 2.75 0.25
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       6.75 7.75 6.75 6.25 1
I SL 23 7 6 5.5
     
WLS in: 10% out: 10% in: out:
Walks ms ms CleanUps ok ms -13 -4