D   a   y       L   o   g
D   a   y       L   o   g
Monday 19. januára 2009
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -1 6.5 7.5 7 6 5.5 -0.5
II EX   0.75     ms
IIIa MCh 7.75 8.25 0.5 1.25     0.75
IIIb MCh PF       4 it. Wght 97.3 -3
II–III M       0.5 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD 51 7.5 11.5 1.25 0 2.5 4 -1.25
IXb FP        
X FA        
XI F 52 14.5 21 4.75 -0.75
XII NCh 14.25 14.5 0.25 2     1.75
XIII PrN       0.25     ms
XIV NP 51 8.25 19.5 2 0.75     -1.25
XII–XIV N       2.25 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       6 0 2.5 4 -2
  S         9.5 9.5 9.5 -9.5
XVIIa ECh1 17.75 19.25 1.5 5 it.     -4
XVIIb ECh2 21 22.5 1.5 5.5     3.75
XVIIc TXT   na     ok
XVIId PRG   na     ok
XVII ECh       3 1.5     -1.5
XVIIIa EML1 53 6.5 10.5 1.5 na     ms
XVIIIb EML2 11.5 14.25 2.75 na    
XIX AL 22.5 22.75 0.25 1.25 2.25 2.75 1
XVIII–XIX Out       4.5 1.25 2.25 2.75 -3.25
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       9.5 7.75 6.75 6.25 -1.75
I SL 22.75 7 6 5.5
     
WLS in: 10% out: 20% in: 10% out: 10%
Walks ok ms CleanUps ms ms -14 -1 -1
7.75 10.5 10 19.25 2nd Part = F
17.75 19.5
7.5 10