D   a   y       L   o   g
D   a   y       L   o   g
Wednesday 21. januára 2009
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F 0.25 6 5.75 7 6 5.5 1.25
II EX tn 6 6.75 0.75 0.75     ok
IIIa MCh 51 6.75 9.25 2.5 1.25     -1.25
IIIb MCh PF       4 it. Wght 98.2 -3
II–III M       3.25 2     -1.25
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD       0 2.5 4  
IXb FP 52 12.5 19.5 2.25  
X FA        
XI F   19.5 21 1.5  
XII NCh 51 13.75 17.75 4 2     -2
XIII PrN       0.25     ms
XIV NP 53 9.25 18.75 2.75 0.75     -2
XII–XIV N       6.75 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       3.75 0 2.5 4  
  S       2.25 9.5 9.5 9.5 -7.25
XVIIa ECh1 21 21.5 0.5 5 it.     -4
XVIIb ECh2 5.5     7.75
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       0.5 1.5     1
XVIIIa EML1 11.25 12.5 1.25 na     ms
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       1.25 1.25 2.25 2.75  
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       8.5 7.75 6.75 6.25 -0.75
I SL 21.5 7 6 5.5
     
WLS in: 10% out: 100% in: 10% out: 45%
Walks ok ms CleanUps ms ms -16 -3 -1
incl. DN, LT  
13.75 17.75 18 18.75
11.25 18