D   a   y       L   o   g
D   a   y       L   o   g
Friday 23. januára 2009
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL F 0.25 6 5.75 7 6 5.5 1.25
II EX tn 6 6.75 0.75 0.75     ok
IIIa MCh 51 6.75 10.25 2.75 1.25     -1.5
IIIb MCh PF       4 it. Wght 98.7 -3
II–III M       3.5 2     -1.5
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 16 17 1 1    
IXa FD       0 2.5 4  
IXb FP   8 8.75 0.75  
X FA        
XI F   18.5 20 1.5  
XII NCh 13.75 16 2.25 2     -0.25
XIII PrN       0.25     ms
XIV NP F 10.25 17.5 3.75 0.75     -3
XII–XIV N       6 3     NA
XV S2b 21.5 22.5 1 3 2.75 2 -1.75
XVI S3   1.5 3
VII S1         4 2.75 2 -2.75
VIII + XV S2       2 4 2.75 2 -0.75
XVI S3           1.5 3  
VII+VIII+XV PS       2 8 5.5 4 -3.5
VII+VIII+XV+XVI RS       2 8 5.5 4 -3.5
IX–XI FS       2.25 0 2.5 4  
  S       2.75 9.5 9.5 9.5 -6.75
XVIIa ECh1 17.5 18.5 1 5 it.     -4
XVIIb ECh2 20 21.5 1.5 5.5     8.25
XVIIc TXT   na     ms
XVIId PRG   na     ok
XVII ECh       2.5 1.5     -1
XVIIIa EML1   na     ms
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75 1.25
XVIII–XIX Out         1.25 2.25 2.75 1.25
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       9.5 7.75 6.75 6.25 -1.75
I SL 22.5 7 6 5.5
     
WLS in: 10% out: 10% in: 10% out: 10%
Walks ok ms CleanUps ms ms -18 -5 -1
8 8.75 incl. DN, LT
13.5 17