D   a   y       L   o   g
D   a   y       L   o   g
Saturday 24. januára 2009
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL 51 -1.5 11.75 12.75 7 6 5.5 -5.75
II EX   0.75     ms
IIIa MCh 1.25     ms
IIIb MCh PF       4 it. Wght 98.2 -3
II–III M         2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 14.25 16.75 2.5 1    
IXa FD       0 2.5 4  
IXb FP        
X FA        
XI F        
XII NCh 13 14.25 1.25 2     0.75
XIII PrN       0.25     ms
XIV NP   0.75     ms
XII–XIV N       1.25 3     NA
XV S2b 53 18.75 23 2.5 3 2.75 2
XVI S3   1.5 3
VII S1         4 2.75 2 -4
VIII + XV S2       5 4 2.75 2 1
XVI S3           1.5 3  
VII+VIII+XV PS       5 8 5.5 4 -3
VII+VIII+XV+XVI RS       5 8 5.5 4 -3
IX–XI FS         0 2.5 4  
  S       5 9.5 9.5 9.5 -4.5
XVIIa ECh1 16.75 18.75 2 5 it.     -4
XVIIb ECh2 52 20.25 22 1.75 5.5     5
XVIIc TXT   na     ok
XVIId PRG   na     ms
XVII ECh       3.75 1.5     -2.25
XVIIIa EML1 6 6.5 0.5 na     ms
XVIIIb EML2 11.75 13 1.25 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       1.75 1.25 2.25 2.75 -0.5
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       12.75 7.75 6.75 6.25 -5
I SL 23 7 6 5.5
     
WLS in: 10% out: 10% in: out:
Walks ms ms CleanUps ms ms -19 -6 -1
6 6.5
DN, LT
20.25 22