D   a   y       L   o   g
D   a   y       L   o   g
Sunday 25. januára 2009
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -1 10.25 11.25 7 6 5.5 -4.25
II EX   0.75     ms
IIIa MCh 10.25 11 0.75 1.25     0.5
IIIb MCh PF       4 it. Wght 96.9 -3
II–III M       0.75 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD 51 11 30 17 0 2.5 4 -13
IXb FP        
X FA        
XI F        
XII NCh 15.75 17.75 2 2     ok
XIII PrN       0.25     ms
XIV NP   0.75     ms
XII–XIV N       2 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       17 0 2.5 4 -13
  S         9.5 9.5 9.5 -9.5
XVIIa ECh1 5 it.     -5
XVIIb ECh2 5.5     2.75
XVIIc TXT   na     ms
XVIId PRG   na     ok
XVII ECh         1.5     ms
XVIIIa EML1   na     ms
XVIIIb EML2 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out         1.25 2.25 2.75 1.25
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       11.25 7.75 6.75 6.25 -3.5
I SL 30 7 6 5.5
     
WLS in: 10% out: 90% in: out:
Walks ms ms CleanUps ms ms -20 -7 -1
15.75 17.75