D   a   y       L   o   g
D   a   y       L   o   g
Saturday 31. januára 2009
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL -1.25 5 6.25 7 6 5.5 0.75
II EX   0.75     ms
IIIa MCh 53 5.25 12.75 2 1.25     -0.75
IIIb MCh PF       4 it. Wght 97.1 -3
II–III M       2 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 -2
VIII S2a 14.75 15.5 0.75 1    
IXa FD 52 12.75 17.75 0.75 0 2.5 4 -0.75
IXb FP 51 6.25 20.75 6.5 -2.5
X FA        
XI F        
XII NCh 17.75 18.5 0.75 2     1.25
XIII PrN       0.25     ms
XIV NP 7.5 11.75 4.25 0.75     -3.5
XII–XIV N       5 3     NA
XV S2b 23.25 25 1.75 3 2.75 2 -0.25
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2       2.5 4 2.75 2 0.5
XVI S3           1.5 3  
VII+VIII+XV PS       2.5 8 5.5 4 -1.5
VII+VIII+XV+XVI RS       2.5 8 5.5 4 -1.5
IX–XI FS       7.25 0 2.5 4 -3.25
  S       9 9.5 9.5 9.5 -0.5
XVIIa ECh1 20.75 23.25 2.5 5 it.     -4
XVIIb ECh2 5.5     5.25
XVIIc TXT   na     ms
XVIId PRG   na     ok
XVII ECh       2.5 1.5     -1
XVIIIa EML1 53 5 12 0.75 na     ms
XVIIIb EML2 18.5 18.75 0.25 na    
XIX AL 1.25 2.25 2.75
XVIII–XIX Out       1 1.25 2.25 2.75 0.25
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       10.5 7.75 6.75 6.25 -2.75
I SL 25 7 6 5.5
     
WLS in: 10% out: 5% in: 10% out: 10%
Walks ms ok CleanUps ms ms -24 -4 -1
7.25 13.25 14.75 15.5 17.5 18.75
13.25 17.5
5.25 7 7.25 11.75 6.25 7.25 7.5 12