D   a   y       L   o   g
D   a   y       L   o   g
Sunday 1. februára 2009
\
Act. No. Activity nb Began Ended Length prescribed Bonus / Deficit
ideal less least
I SL 1 7.75 6.75 7 6 5.5 0.25
II EX   0.75     ms
IIIa MCh 51 9 11.25 1 1.25     0.25
IIIb MCh PF       4 it. Wght 99.1 -3
II–III M       1 2     NA
IV FL   0.25     ms
V PrM       0.25     ms
VI QU   0.5     ms
IV–VI US         1     ms
VII S1 4 2.75 2 ms
VIII S2a 1    
IXa FD 52 9.25 25.5 12.5 0 2.5 4 -8.5
IXb FP        
X FA        
XI F        
XII NCh 15 15.5 0.5 2     1.5
XIII PrN       0.25     ms
XIV NP 10.5 10.75 0.25 0.75     0.5
XII–XIV N       0.75 3     NA
XV S2b 3 2.75 2 ms
XVI S3   1.5 3
VII S1         4 2.75 2 -2
VIII + XV S2         4 2.75 2 -2
XVI S3           1.5 3  
VII+VIII+XV PS         8 5.5 4 -4
VII+VIII+XV+XVI RS         8 5.5 4 -4
IX–XI FS       12.5 0 2.5 4 -8.5
  S         9.5 9.5 9.5 -9.5
XVIIa ECh1 23.25 24.75 1.5 5 it.     -4
XVIIb ECh2 5.5     3
XVIIc TXT   na     ok
XVIId PRG   na     ok
XVII ECh       1.5 1.5     ok
XVIIIa EML1 7.75 9 1.25 na     ms
XVIIIb EML2 14.5 15 0.5 na    
XIX AL 23 23.25 0.25 1.25 2.25 2.75 1
XVIII–XIX Out       2 1.25 2.25 2.75 -0.75
XX JR   0.25     ms
XXI PrB       ms
I + XIV SLS       7 7.75 6.75 6.25 0.75
I SL 25.5 7 6 5.5
     
WLS in: 10% out: 10% in: 10% out: 10%
Walks ms ms CleanUps ms ms 1 -3 1
9.25 10.25 10.5 10.75
10.25 11.25 14.5 15.5 23 24.75